confidence moves the world

railway & urban transport engineering services

confidence moves the world

railway & urban transport engineering services

ROADS - HIGHWAYS - EXPRESSWAYS - TOLL ROADS

ROADS - HIGHWAYS - EXPRESSWAYS - TOLL ROADS

Projects

Client

Services Provided

ALBANIA

 

 

New Highway Vora-Durres (km 20,5)

PHARE – European Community/General Road Department of Tirana

Supervision of works

ARGENTINA

 

 

Highway n° 34. Section Pozo Hondo-Garmendia

Dirección General de Vialidad - Buenos Aires

Traffic study, environmental impact study and final design

CAMEROON

 

 

Bafia – Bafoussam Highway (194 km)

Bridges/Viaducts 980 m

Ministère de l’Equipment et de l’Habitat - Yaoundé (FED)

Final design

CENTRAL AFRICA REPUBLIC

 

 

Reconstruction and reinforce-ment of 22 bridges on National Highways No. 2 and 3

Bridges/Viaducts 338 m

Ministère des Travaux et de l’Urbanisme - Bangui (FED)

Supervision of works

GUATEMALA

 

 

Periodic maintenance study of the highway CA 10-Rio Hondo-Agua Caliente

Interamerican Development Bank (I.D.B.)

Traffic study and final design including the new pavement

Detailed engineering study for the improvement of the highway CA 14 El Rancho-Coban

Ministerio de Transporte, Comunicaciones y Vivienda – D.G.C.

Detailed engineering study, economical and environmental evaluation

KENYA

 

 

Isiolo-Moyale Road

Ministry of Works - Nairobi (FED)

Feasibility study

IRAQ

 

 

Arbil-Rawanduz-Haj Omran Superhighway - 166 km

Bridges/Viaducts 8,000 m

Tunnels 15,000 m

Ministry of Works and Housing - Baghdad

Preliminary and final design

ITALY

 

 

Cispadana Highway – 120 km

Bridges/Viaducts 2,000 m

Regione Emilia Romagna

Feasibility study and preliminary design

Toll Road dei Trafori: Section Gattico-Feriolo - 30 km

Bridges/Viaducts 3,222 m

Tunnels 9,780

Soc. Autostrade S.p.A.

Preliminary and final design, environmental impact study

Dual divided freeway system of Bologna Node: widening from 8 to 12 lanes - 32 km

Bridges/Viaducts 1,041 m

Soc. Autostrade S.p.A.

Preliminary and final design

Dual divided freeway system of A14: widening from 4 to 6 lanes - 90 km

Bridges/Viaducts 2,900 m

Soc. Autostrade S.p.A.

Preliminary design, final design, work supervision and environmental impact study (sections)

Toll Road Milano-Roma: new crossing of the Appennini mountains between Sasso Marconi and Barberino del Mugello (Section 1)

Bridges/Viaducts 700 m

Tunnels 2 x 2,200 m

Soc. Autostrade S.p.A.

Preliminary design, final design and environmental impact study

Toll Road Milano-Roma. Additional Carriageways between Melegnano-Lodi and Bologna-Sasso Marconi - 23 km

Bridges/Viaducts 146 m

Soc. Autostrade S.p.A.

Preliminary design, final design and environmental impact study

Toll Road Livorno-Civitavec-chia. Sections Livorno-Cecina 40 km and Capalbio-Civitavecchia: 42 km

Bridges/Viaducts 2x 15,484

One viaduct having length: 10,500 m

Tunnels 2 x 1,590 m

Cut and cover 810 m

S.A.T. Società Au-tostrada Tirrenica S.p.A.

Preliminary design of the whole road: 228 km. Final design and environmental impact study of 2 sections: 82 km. Supervision of works of 1 section: 40 km

Interchange Node of Torino-Stura and urban motorway

Bridges/Viaducts 3,600 m

Tunnels 2 x 400

Regione Piemonte

Preliminary and final design

Dual divided freeways Modena-Bologna and Rimini-Cattolica – 65 km

Bridges/Viaducts 4,015 m

Soc. Autostrade S.p.A.

Feasibility study, preliminary design and environmental impact study

Upgrading of A11 Motorway Florence-Lucca section-60 km

Bridges/Viaducts630 m

Tunnels 2,100 m

Soc. Autostrade S.p.A.

Preliminary and final design

Dual divided freeway of Bologna Node

Soc. Autostrade S.p.A.

Environmental impact study of the atmosferic and noise pollution

Motorway E 55 – section Alfonsine-Ariano Polesine

Bridges/Viaducts 4,100 m

Regione Emilia Romagna

Feasibility study and preliminary design

Modena-Sassuolo – Highway links

Regione Emilia Romagna

Environmental impact study and preliminary design

Upgrading of Rimini Nord-Riccione section

Bridges/Viaducts 600 m

Soc. Autostrade S.p.A.

Preliminary and final design

New motorway Livorno-Civitavecchia: monitoring system for highway structures survey management

S.A.T. Società Autostrada Tirrenica S.p.A.

Control and measurement of the performances of the main viaducts

Technological modernization, improvement and extention of the Motorway Toll Stations

Soc. Autostrade S.p.A.

Final design and supervision of works

Ancillary buildings and service areas of the motorways A1, A9 and A14

Soc. Autostrade S.p.A.

Preliminary study and final design

Dual divided freeway system of Bologna Node: widening from 8 to 12 lanes - 32 km

Bridges/Viaducts 1,041 m

Soc. Autostrade S.p.A.

Preliminary and final design

Dual divided freeway system of A14: widening from 4 to 6 lanes - 90 km

Bridges/Viaducts 2,900 m

Soc. Autostrade S.p.A.

Preliminary design, final design, work supervision and environmental impact study (sections)

Toll Road Milano-Roma: new crossing of the Appennini mountains between Sasso Marconi and Barberino del Mugello (Section 1)

Bridges/Viaducts 700 m

Tunnels 2 x 2,200 m

Soc. Autostrade S.p.A.

Preliminary design, final design and environmental impact study

Toll Road Milano-Roma. Additional Carriageways between Melegnano-Lodi and Bologna-Sasso Marconi - 23 km

Bridges/Viaducts 146 m

Soc. Autostrade S.p.A.

Preliminary design, final design and environmental impact study

Toll Road Livorno-Civitavec-chia. Sections Livorno-Cecina 40 km and Capalbio-Civitavecchia: 42 km

Bridges/Viaducts 2x 15,484

One viaduct having length: 10,500 m

Tunnels 2 x 1,590 m

Cut and cover 810 m

S.A.T. Società Au-tostrada Tirrenica S.p.A.

Preliminary design of the whole road: 228 km. Final design and environmental impact study of 2 sections: 82 km. Supervision of works of 1 section: 40 km

Interchange Node of Torino-Stura and urban motorway

Bridges/Viaducts 3,600 m

Tunnels 2 x 400

Regione Piemonte

Preliminary and final design

Dual divided freeways Modena-Bologna and Rimini-Cattolica – 65 km

Bridges/Viaducts 4,015 m

Soc. Autostrade S.p.A.

Feasibility study, preliminary design and environmental impact study

Upgrading of A11 Motorway Florence-Lucca section-60 km

Bridges/Viaducts630 m

Tunnels 2,100 m

Soc. Autostrade S.p.A.

Preliminary and final design

Dual divided freeway of Bologna Node

Soc. Autostrade S.p.A.

Environmental impact study of the atmosferic and noise pollution

Motorway E 55 – section Alfonsine-Ariano Polesine

Bridges/Viaducts 4,100 m

Regione Emilia Romagna

Feasibility study and preliminary design

Modena-Sassuolo – Highway links

Regione Emilia Romagna

Environmental impact study and preliminary design

Upgrading of Rimini Nord-Riccione section

Bridges/Viaducts 600 m

Soc. Autostrade S.p.A.

Preliminary and final design

New motorway Livorno-Civitavecchia: monitoring system for highway structures survey management

S.A.T. Società Autostrada Tirrenica S.p.A.

Control and measurement of the performances of the main viaducts

Technological modernization, improvement and extention of the Motorway Toll Stations

Soc. Autostrade S.p.A.

Final design and supervision of works

Ancillary buildings and service areas of the motorways A1, A9 and A14

Soc. Autostrade S.p.A.

Preliminary study and final design

New eastern corniche road of Rome

Metropolis S.p.A. - National Italian Railways

Technical - economic feasibility study and preliminary design

Improvement extension of service area of “Peretola”

Soc. Autostrade S.p.A.

Final design and supervision of works

Improvement extension of service area of “Chianti Est”

Soc. Autostrade S.p.A.

Preliminary and final design

Widening from 6 to 8 lanes of the highway A1 – Section Bologna – Modena

Bridges/Viaducts 9

S.P.E.A. S.p.A.

Final design

Toll Road A1 Milano-Napoli new crossing of the Appennini montains between Sasso Marconi–La Quercia (km 5,5)

S.P.E.A. S.p.A.

Final Design

Road n° SS 117 “Centrale Sicula”

A.N.A.S. – Roma

Detailed design

Road n° SS 195 “Sulcitana” Cagliari-Pula

Regione Autonoma della Sardegna – Cagliari

Preliminary design and detailed design

Motorway “G.R.A.” di Roma (km 0+450 ÷ km 8+800)

A.N.A.S. – Roma

Final design

Road n° SS 106 “Jonica”

Provincia di Reggio Calabria

Preliminary design

KOSOVO

 

 

Road for Pristina Airport

PHARE – European Community

Supervision of works

MOZAMBIQUE

 

 

Alto Molocue-Nampevo Road - 120 km

Bridges/Viaducts 375 m

Ministerio das Obras Publicas y Habitacâo - Maputo - AfDB

Revision of the final design, supervision of the works

Rehabilitation of Zambeze Bridge in Tete – 762 m

Bridges/Viaducts: Suspend. bridge: 762 m, 5 spans 3 of which each: 180 m

Ministerio das Obras Publicas y Habitacâo - Maputo – KFAED

Final design

Rural Roads Rehabilitation and Construction Projects (included in the Integrated Multisectorial Development Program of the Province of Maputo)

Ministerio de Agricoltura – Maputo

Final design and su-pervision of works

NIGERIA

 

 

Benin-Asaba Highway - 135 km

Bridges/Viaducts: 305 m

Federal Ministry of Works – Lagos

Preliminary and final design

 

 

 

Loko Iga-Okpaya Highway - 50 km

Bridges/Viaducts: 200 m

Federal Ministry of Works – Lagos

Preliminary and final design

PERU

 

 

Rehabilitation of the Juliaca-Pucarà Highway

Ministerio de Transporte, Comunicaciones, Vivienda y Construcciones – Lima

Supervision of works

Rehabilitation of the Huallaga Bridges

Bridges/Viaducts: 495 m

Ministerio de Transporte, Comunicaciones, Vivienda y Construcciones – Lima

Final engineering and supervision of works

Rehabilitation of the Ilo – Desaguadero – Section IVs

Ministerio de Transporte, Comunicaciones, Vivienda y Construcciones – Lima

Supervision of works

Supervision of construction works for the interchange “Los Cabitos”

Municipalidad de Lima – Metropoli­ta­na Invermet

Supervision of works

Feasibility study of the highways in the Selva Norte Region

Ministerio de Transporte, Comunicaciones, Vivienda y Construcciones – PERT (Lima)

Economic feasibility study and environmental impact study

Rehabilitation of the highway Pacasmayo-Cajamarca

Ministerio de Transporte, Comunicaciones, Vivienda y Construcciones - SINMAC (Lima)

Supervision of works and control of the reconstruction works

SAUDI ARABIA

Corniche Road of the City of Jeddah

Bridges/Viaducts: 1,950 m

Ministry for Municipal and Rural Affairs - Jeddah

Preliminary and final design

Hail-Jubbah and Hail-Rapha Highway - 529 km

Bridges/Viaducts: 1,500 m

Ministry of Communications – Riyadh

Preliminary and final design

Abu Hadriyah - Turaif Motor-way - 1,399 km

Bridges/Viaducts: 14,500 m

Ministry of Communications – Riyadh

Preliminary, final de-sign and supervision of works (2 sections)

Improvement of the Seconda-ry Roads of the City of Jeddah - 230 km

Ministry for Municipal and Rural Affairs - Jeddah

Final design and su-pervision of works

Coastal Road of the City of Jeddah - 57 km

Bridges/Viaducts: 282 m

Ministry of Communications – Riyadh

Final design

TANZANIA

Major Roads of the City of Dodoma - 45 km

Bridges/Viaducts: 63 m

Ministry of Capital Development Authority - Dar Es Salaam

Final design